Furnish & Install: Removal of 60 mil TPO (Thermoplastic Polyolefin) membrane and replacement to achieve a 20 year manufacturer’s warranty. 1. Cut, and remove the existing roofing membrane and dispose of properly 2. Cut out 12” of EIFS (stucco) from the membrane termination for new counter flashing – replace stucco at the end of the project 3. Mechanically fasten a 60 mil TPO roofing system including all flashings and terminations 4. Install up to 200’ of walk pad 5. Install new termination bar and counter flashing 6. Remove and replace any roof decking as needed due to possible damage. All extra repairs to roof decking to be approved by Macon County Maintenance Supervisor prior to repair work Provide a 20 year manufacturer’s no dollar limit warranty and a 2 year workmanship warranty Work to begin following current construction project at the site Approx. 13,000 sq.ft.