1.) Demolition of existing south side scale • Disconnect power from scale including traffic lights, weight display, and control box. • Demolish and remove scale and its appurtenances. • Cut guard rail posts flush with existing grade. • Remove under scale concrete slab as necessary to leave a level surface. COUNTY shall provide any recycled gravel to the CONTRACTOR to install as needed to leave a level surface. 2.) Truck turn extension • 1stlift - fine grade existing stone and pave 2.5" I19.0C intermediate course. • 2nd lift- clean, prep, apply tack coat and pave 1.5" S9.5B surface course. • Transition to existing asphalt to provide a continuous paved surface. 3.) Truck staging area • 1st lift -fine grade existing stone and pave2.5" I19.0C intermediate course. • 2nd lift - clean, prep, apply tack coat and pave 1.5" S9.5B surface course. • Transition to existing asphalt to provide a continuous paved surface. 4.) Sealcoat and Striping • Clean existing parking area. • Apply two (2) coats of asphalt seal coating. • Apply standard paint marking for parking spaces. Parking area includes one (1) handicapped space.