a. Paint all interior walls to include drywall walls, bulkheads, adjacent drywall ceilings, concrete masonry unit walls, painted doors, metal door frames. Contractor responsible for including removal and re-installation of all signage. (see attached drawings and finish schedule) Patch any holes in drywall prior to painting. b. Strip and re-stain all stained doors. Removal and re-install all signage including any vinyl signage. c. The Contractor shall take all necessary precautions to protect the building's adjoining surfaces and equipment from damage incurred with their operations. d. All material shall be applied according to the manufacturer's specifications with special attention to surface preparation, thinning of material, and drying time between coats. e. All furnishings and equipment shall be placed back in the original locations. All spaces must be cleaned and left in an acceptable condition. f. The Contractor shall be responsible for the provision of adequate and proper safety precautions for both their workers and all persons in or around the work area at all times. g. The Contractor will be responsible to repair all damage to any property damaged by their operations or employees. h. All work shall conform to all existing Building Codes and Regulations. The work must be accomplished with professional methods and standards of the trade. i. The Contractor must be mindful of different security protocols at County locations and abide by them. j. The Contractor shall maintain a respectful demeanor around all County employees as well as the general public by adhering to proper standards of clothing, language, and attitude.