A more detailed Scope of Work includes, but is not necessarily limited to, the following: 2.1 Tap and install a four (4) inch SCH 40 PVC gravity sewer service inclusive of clean out, piping, fittings, and appurtenances from the main to the property line. 2.2 Establish traffic control during the performance of the work, ensuring measures are in place for safety and all compliance requirements. 2.3 Contractor shall endeavor to minimize any disturbance to roadway, and any disturbance shall be restored as required to meet NCDOT and Brunswick County requirements. 2.4 Contractor shall seed and mulch site to NCDOT and Brunswick County standard specifications and shall establish sufficient vegetation to stabilize the disturbed areas. 2.5 The work includes the cost of all mobilization, overhead, insurance, clean up, and all ancillaries necessary for a complete service. 2.6 No debris will be left at the site. 2.7 All materials, restoration, and debris disposal costs must be included in the submitted bid. 2.8 All necessary permits for the work are the responsibility of the contractor. 2.9 Contractor shall attend a meeting at a mutually agreeable time, but within two (2) weeks of notification, with the County to determine set up, staging area, storage, and appropriate work hours prior to commencing services under the awarded contract. 2.10 Contractor shall provide traffic control including, but not limited to, all signs, cones, barricades, and other related or required traffic control devices to meet the NCDOT standards of the Manual on Uniform Traffic Control Devices (MUTCD) https://mutcd.fhwa.dot.gov/ . The work includes all labor, traffic control devices, vehicles, trailers, etc. that may be required to transport, install, and remove the devices after the project is completed. 2.11 Contractor shall be responsible for initiating utility locates with NC811. 2.12 Contractor to submit a forecasted timeline of work and anticipated completion dat