1 SP Emergency Mobilization 5 EA 2 SP Large Debris Removal 50 SMI 3 SP Sweeping with Truck Mounted Attenuators, Interstate Routes 200 SMI 4 SP Sweeping with Truck Mounted Attenuators, Divided Primary Routes 300 SMI 5 SP Sweeping, Undivided Primary Routes 150 SMI 6 SP Sweeping, Secondary Routes 25 SMI 7 SP Additional Sweeping with Truck Mounted Attenuators 40 HR 8 SP Additional Sweeping without Truck Mounted Attenuators 40 HR 9 SP Drainage Structure Clean Out 200 HR 10 SP Shoulder Closure 5 EA 11 SP Ramp Closure 5 EA 12 SP Multi-Lane Roadway, Left Or Right Lane Closure, (8 Hours Or Less, 1 Mile Or Less) 5 EA 13 SP Multi-Lane Roadway, Right Lane Closure Including Ramps And Loops, (8 Hours Or Less, 1 Mile Or Less) 5 EA 14 SP Work Zone Traffic Control, Each Additional Hour 10 EA 15 SP Work Zone Traffic Control, Each Additional Mile 5 EA 16 SP Work Zone Traffic Control, Reset Traffic Control 5 EA 17 1150 Flagger 50 DAY