The Contractor shall furnish and install the reinforced concrete foundations as shown on the drawings, complete with excavation, off-site disposal of excavated spoils, grading, backfilling, and compaction of all excavations to restore existing grade levels, foundation layout, concrete, rebar, tie wire, and forming materials. The Contractor shall install the secondary oil contain ment system as shown on the drawings and adhere to Composolite Secondary Containment System Installation Guidelines. The reinforced concrete foundations, footings, piers and pads shall be installed as indicated on the Drawings, and to undisturbed earth. Dimensions indicated for anchor bolt settings shall be checked against the manufacturer’s erection drawings, structural steel and/or equipment to be installed prior to the construction of the formwork.