The scope of work includes but is not limited to the following: HVAC, Plumbing, Carpentry, Painting & Wallpaper, Drywall & Plaster, Floor Coverings, Electrical, and Roofing Repairs. The scope is specific to each home... BRIEF DESCRIPTION & OWNER CONCERNS: This is a 2,267 square foot, 2-story, brick, 3-bedroom, 2.5-bathroom house built in 1984. The primary concerns are as follows: replacing deteriorated siding, front door glass repair, replacing deck boards, steps, and railing on the rear deck, replacing front stoop railing, replacing a missing foundation vent, installing a new tub/shower unit in the upstairs bathroom, and conducting an electrical check. SPECIFICATIONS DATED: September 14, 2025 INSPECTED BY: Brian Ashburn DATE OF INSPECTION: August 29, 2025 ADDRESS: 3405 Merriman Rd Rocky Mount, NC 27804 General Conditions: 1. Contractors are to include all overhead and profit in the individual items. 2. The owner, after careful review, understands and accepts the scope of the work described and has initialed and dated each page of the work write-up. 3. Contractor certifies that he/she has reviewed and agrees to perform the scope of work described and has initialed and dated each page of the work write up. 4. The contractor shall remedy any defect due to faulty material or workmanship and pay for all damage to other work resulting therefrom, which appears within one year from final payment by the City. All reported deficiencies or issues must be resolved by the Contractor whether the work of subcontractors or not. The City will not contact subcontractors to resolve issues. Further, the contractor shall furnish the owner with all manufactures and suppliers’ written warranties covering items furnished under the contract prior to release of final payment. Roof replacement work requires a two-year warranty. 5. All lead-based paint renovation activities performed for compensation in target housing shall be conducted in accordance with North Carolina Renovate, Repair and Paint (RRP) Rule and, when using US Department of Housing and Urban Development (HUD) funds, 24 CFR 35 Subpart J. To bid on a pre-1978 property, the contractor’s firm must provide all required Lead documents including RRP firm certification and renovator letter. 6. Remove from site all construction materials, tools, and debris. Sweeps clean all exterior work areas. Vacuum all interior work areas, removing all visible dust, stains, labels and tags. 7. All painting must be of the highest quality. The surfaces must be prepared and inspected before painting. 8. The primer and topcoats must have the same tint; BRIEF DESCRIPTION & OWNER CONCERNS: Conventional ranch home built in 1963, consisting of 1154 heated square feet and two unheated porches. The owner’s primary concerns include replacement of doors and windows, replacement of handrails at the door on the left side of the home, and repair of kitchen ceiling damage from a previous leak. SPECIFICATIONS DATED: September 13, 2025 INSPECTED BY: Brian Ashburn DATE OF INSPECTION: August 29, 2025 ADDRESS: 790 Cascade Ave Rocky Mount NC 27803 General Conditions: 1. Contractors are to include all overhead and profit in the individual items. 2. The owner, after careful review, understands and accepts the scope of the work described and has initialed and dated each page of the work write-up. 3. Contractor certifies that he/she has reviewed and agrees to perform the scope of work described and has initialed and dated each page of the work write up. 4. The contractor shall remedy any defect due to faulty material or workmanship and pay for all damage to other work resulting therefrom, which appears within one year from final payment by the City. All reported deficiencies or issues must be resolved by the Contractor whether the work of subcontractors or not. The City will not contact subcontractors to resolve issues. Further, the contractor shall furnish the owner with all manufactures and suppliers’ written warranties covering items furnished under the contract prior to release of final payment. Roof replacement work requires a two-year warranty. 5. All lead-based paint renovation activities performed for compensation in target housing shall be conducted in accordance with North Carolina Renovate, Repair and Paint (RRP) Rule and, when using US Department of Housing and Urban Development (HUD) funds, 24 CFR 35 Subpart J. To bid on a pre-1978 property, the contractor’s firm must provide all required Lead documents including RRP firm certification and renovator letter. 6. Remove from site all construction materials, tools, and debris. Sweeps clean all exterior work areas. Vacuum all interior work areas, removing all visible dust, stains, labels and tags. 7. All painting must be of the highest quality. The surfaces must be prepared and inspected before painting. 8. The primer and topcoats must have the same tint. 9. Paint and Primer shall be the following or approved equal: a. Sherwin Williams “Super Paint”, “Resilience”, “Duration” or “Emerald”.