The Contractor will be responsible for performing a rehabilitation needs assessment and cost estimate for homeownerrequested corrective actions, with follow-up monitoring until project completion in a manner satisfactory to the City. Projects will include the following activities: Phase I – Planning phase: a. Perform one or more inspections of each residential home to document existing conditions; b. Prepare an existing and, if needed, a proposed floor plan of the house; c. Document existing conditions with photos; d. Prepare a rehabilitation/construction work write-up up including results of inspection, recommended remediation tasks, and materials needed that meet the City’s minimum housing code requirements, and a rehabilitation/construction cost estimate. At a minimum, the write-up should detail: 1. Describe specific rehabilitation need(s); 2. Prioritize need(s), if more than one; and 3. Estimate the cost for labor and materials required for each need. 4. Have the homeowner sign and date the work write-up f. Revise residential rehabilitation write-ups, if needed. Phase II - Pre-Rehabilitation: a. Manage and attend pre-bid on-site meeting with qualified construction contractors.