A more detailed Scope of Work includes, but is not necessarily limited to, the following: 3.1 Insert Install HDPE high-density polyethylene, extra high molecular- weight, PE3408 pressure rated 200PSI, minimum DR-9, as manufactured by Plexco or equal using horizontal directional drilling methods according to the specified length and size above. 3.2 The contractor shall reconnect using open-cut methods at each end of the directional drill, incorporating all necessary fittings and bends to ensure a complete and secure tie-in to the existing water or sewer line. Mechanical fittings shall be authorized by the manufacturer for use on HDPE and/ or Fusible PVC 3.3 The contractor shall pressure test both sewer and water line, chlorinate and perform BAC-T Test on the water line. The contractor shall ensure required NC Division of Environmental and Brunswick County standards for chlorination and bacteriological testing have been met. Work will not be considered complete until passing bacteriological tests have been received. 3.4 The contractor shall abandon the existing section of sewer force main pipe approximately 150’ of 4” by filling it completely with flowable fill to prevent future collapse or voids. All necessary connections shall be made to ensure a continuous and thorough fill throughout the abandoned section. The contractor is responsible for verifying that the pipe is fully filled and that all work is completed in accordance with applicable regulations and project specifications. 3.5 The contractor shall establish traffic control during the performance of the work, ensuring measures are in place for safety and all compliance requirements. The contractor shall provide all signs, cones, barricades, and other related or required traffic control devices. The contractor is responsible for traffic control planning and approval by any jurisdictional regulating agency. The contractor shall include all labor, traffic control devices, vehicles, trailers, etc. that may be required to transport install and remove the devices after the project is completed. 3.6 The contractor shall endeavor not to disturb the existing roadway. Any disturbance shall be restored as required. 3.7 The contractor shall seed and mulch site to BCPU standard specifications and shall establish sufficient vegetation to stabilize the disturbed areas. 3.8 The work includes the cost of all mobilization, overhead, insurance, clean up, and all ancillaries necessary for a complete service. 3.9 All materials, restoration, and debris disposal costs must be included in the submitted bid. 3.10 All necessary permits for the work are the responsibility of the contractor. 3.11 The selected contractor shall attend a meeting at a mutually agreeable time, but within two weeks of notification, with the owner to determine set up, staging area, storage, and appropriate work hours prior to commencing services under the awarded contract. The contractor to submit a forecasted timeline of work and anticipated completion date.