The Project includes the following Work: 1. Division 02 - Gravity Sewer a. Construction of 2,770 LF of 12” gravity sewer b. 390 LF jack and bore crossing of US Highway 321 c. Located between Zion Church Road and River Road. 2. Division 03 - Force Main a. Construction of 15,645 LF of 8-inch force main as follows: 1) 10,660 LF 8-inch PVC 2) 4,350 LF 8-inch DIP 3) 635 LF 8-inch SDR11 HDPE installed by Horizontal Directional Drill b. Abandonment of portions of an existing 6-inch force main and air release valves. c. Located along Hickory Lincolnton Highway and Zion Church Road. 3. Division 04 - Pump Station a. Construction of a 550-gpm duplex submersible wastewater pump station with associated 10-foot diameter wetwell. Work also includes associated electrical components, emergency generator, required site improvements, and access road. b. Located along Hickory Lincolnton Highway.