The City of Durham plans to retrofit the obsolete building controls at the General Services Building, as the building’s controls are failing and are no longer being manufactured or supported. The Controls Contractor selected for the job will be required to perform the following activities as part of their contract. • Back Up the old system and configuration • Replace older PUP Network controls with modern BACnet controls. Provide old controllers to the City for use as spares. • Replicate any programming, trends, and settings that are active in the current system. Reestablish any connections between devices, as well as to schedules and systems outside of General Services. • Integrate the new controls to the Jace and provide necessary information to Brady Services, who will update the Enterprise Web Supervisor • Update the Jace to Niagara version 4.10 • Commission the new controls to ensure full functionality in the present system is working properly in the new system • Remove old PUP devices from the system to free up device licenses • Update controls schematics and sequences of operation or create them if old schematics and sequences are unavailable • Provide any software necessary to update controller-level settings if they are not able to be updated via the City’s Tridium Niagara System