Replacement of the roof at Fire Station #5, 1074 Hendersonville Rd, Asheville, NC 28803 with PVC roofing Current Roof: 5,300 sqft of R-15 insulation and 60 mil TPO roofing Remove, Dispose, Furnish & Install: 1. Remove and dispose of existing roof assembly down to the existing metal deck (tear off include ½” gypsum board, modified bitumen layer, 2.2” insulation, and TPO) 2. Mechanically attach 2.6” Polyisocyanurate insulation (Min R-15, standard felt facers, 20 psi) 3. Mechanically attach tapered insulation crickets between drains and scuppers 4. Mechanically attach 60 mil PVC (WHITE) per manufacturer specifications 5. Adhere 60 mil PVC up and over parapet walls 6. Install new shop fabricated 24ga kynar coated steel coping with 22ga cleat 7. Install new shop fabricated PVC clad scuppers 8. 4’’ min turn up at coping cap and around blocking 9. Install new Shop Fabricated 24ga kynar coated conductor heads and downspouts 10. Provide minimum 2 year Workmanship Warranty 11. Provide minimum 2 year Complementary Maintenance Program 12. Provide minimum 20 year NDL Manufacturer Warranty