4.1 Facilities Condition Assessment: This contract will require inspections of all facilities as specified herein by qualified consultant teams. It will produce an accurate analysis and report that identifies visible and discernable (by ways of non-destructive means) components and elements requiring maintenance or other planned action. The facility conditions survey must focus on the following property elements: Exterior Systems - doors, roofs, window systems Interior Construction - doors, flooring, walls, visible structural components Interior finishes - ceiling, flooring, wall finishes Emergency Power Fencing Fire/Life/Health Safety Systems Accessibility - ADA Heating, Ventilation and Air Conditioning Plumbing Electrical and Service Distribution Fire Suppression Special Construction -athletic fields, courts, gyms, labs, and other site surface structures Site Utilities Vertical Transportation (Elevators, lifts, etc.) Stormwater management and stormwater devices (BMPs) 4.2 Corrections - For significant deficiencies, the Firm shall recommend a corrective action with project cost estimate. A significant deficiency is one that violates code, is a life safety threat, or affects building functionality and reliability. Where appropriate, multiple correction methodologies indicating the range of possible corrective measures and associated costs will be developed by the Firm. 4.3 Categorization/Classification/Prioritization of Audit Data 4.3.1 Deficiency Priorities