Base Bid: 1. Contractor is responsible for all measurements. 2. Only the exterior portions of the building associated with the GAFC will be part of this project. See Attachment D for photo showing this area. 3. Within the boundaries of the work, pressure wash the entire exterior including the upper walls of the building prior to painting any items. Contractor can use water from the facility. 4. Paint shall be by Sherwin Williams or approved equal. See Attachment C for schedule of primer and paint. 5. Preparation of all surfaces shall be done to industry standards and to manufacturer’s instructions. Use safe work practices to remove any old paint. 6. See Attachment D on items that are to be repaired, prepped and painted. Painting of the EIFS is not included in the scope of work. 7. Use a polyurethane sealant to fill in the holes in the EIFS (see Attachment D). Sealant shall match the color of the EIFS as close as possible. Clear can be used if no matching colors are available. 8. Replace two aluminum grates in the soffit as directed (see Attachment D) 9. Cover the exposed plywood in the soffit at the far-right side of the gym with metal and paint to match the existing soffit as close as possible. 10. Clean exterior side of all windows after the work has been completed. 11. Contractor shall take care not to damage any concrete, landscaping, fencing, etc. Any damage caused by the contractor shall be repaired prior to the completion of the project. Contractor shall also be responsible for all damages that may arise from installing the new paint such as but limited to overspray, dropped paint on non-painted surfaces, etc. 12. Contractor shall comply with all OSHA requirements and safety guidelines associated with the work within the scope of work.