102 Washington Avenue (Flat Iron Building) • Remove existing roofing and replace with approximately 1,500 square feet of TPO membrane and insulation (see attached building sketch). • Flash all walls and penetrations with TPO membrane to seal and waterproof the areas where the roof meets other structures. • Replace windows in the building (Windows must be compatible with the historic appearance and character of the building). o 15 windows measuring 37.5 inches X 63 inches; o 2 windows measuring 42 inches by 42 inches; o 1 window measuring 107 inches by 58 inches o 2 windows measuring 107 inches by 71 inches o 1 window measuring 107 inches by 53 inches o 1 window measuring 107 inches by 50 inches o 2 windows measuring 55 inches by 39 inches • Prime and paint building, including trim, with two (2) coats of exterior enamel paint (color to be specified by Town). 101 Washington Avenue (Beside Town Hall) • Install insulation and TPO membrane over existing roof structure, approximately 2,641 SF. • Flash all walls and penetrations with TPO membrane to seal and waterproof the areas where the roof meets other structures. • Prime and paint trim with two (2) coats of exterior enamel paint (color to be specified by Town)