he work includes, but is not limited to, the design of a ~0.39 mile greenway that extends the existing Reed Creek Greenway north towards Riverside Drive. The greenway shall include a continuous, 12-foot wide paved pathway that follows, in general, the alignment described under “Alternative #1C, Hillside and Roadside” of the referenced Reed Creek Greenway 2024 Feasibility Study. (The Consultant may propose modifications to this alignment based on their assessment.) In all aspects the design shall comply with applicable Americans with Disabilities Act (ADA) Standards for Accessible Design and Public Right-of-Way Accessibility Guidelines (PROWAG). It shall also comply with all applicable Municipal, State and Federal regulations. The project has engineering and landscape architectural components, with design to address erosion and sediment control, grading and drainage, hardscape layout and materials (including retaining walls), and planting. The selected Consultant responsible for: ● Project management and attendance at all required meetings (including public presentations) ● Obtainment of all necessary permits/ agency approvals ● Obtainment of necessary easements (compliant with Uniform Act) ● Additional Field Survey (topographic and tree) ● Geotechnical report ● Development of Schematic, Design Development, and Construction Drawings ● Development of Engineer’s Estimate for each Design phase ● Anticipated Design Schedule - updated throughout project ● Illustrative renderings (2D and/or 3D) ● Bidding and Construction Administration