The project scope of work generally includes, but is not limited to the following primary tasks: • CFPUA contracted professional services to provide a comprehensive engineering analysis for each of three options, repair in place, full replacement within existing easement, and re-alignment within N. Terminal property for twin 48” PCCP raw water distribution pipes. • Estimate remaining useful life of existing assets while outlining optimal repair, protection, and replacement strategies • Technical memorandum summarizing analysis methodology and findings • Recommendations with cost estimates and implementation timeline for each option • This project will include all necessary survey, planning, design, technical specifications and construction for the desired option chosen by CFPUA & DB team. • The project will require all necessary permit approvals and certifications to complete the scope of work. • Existing raw water distribution must remain in service and adequately protected at all times.