The Contractor shall provide turnkey fiber construction services primarily consisting of, but not limited to the following tasks: • Initiation of utility locate requests through the North Carolina One Call Center (NC811), and strict adherence to all North Carolina Underground Damage Prevention Statutes • Sub-surface installation of conduit, primarily through the use of horizontal directional drilling, including in utility locating through test pitting, traffic control, and temporary paved surface restoration • Installation of underground handholes/pull-boxes, including permanent surface restoration • Placement of fiber optic cable and/or locatable pull tape in conduit • Construction “make-ready” work to prepare pole lines for new attachments • Installation of ADSS cable and attachments on utility poles • All installations must be completed by the NCDOT LET of 4/28/2026. Greenlight will provide all engineering work documents necessary for construction, and will supply or facilitate all local, NC DOT, and environmental permitting required. Greenlight will not assess permitting fees to the Contractor for performance in accordance with the scope of this document. Any permitting costs to outside entities shall be borne by Greenlight, and if required to be paid by the Contractor, shall be charged to Greenlight at direct cost. The Contractor shall be required to perform permanent restoration of all surfaces, according to Greenlight and NCDOT standards, for accidental damage or otherwise unnecessary surface disturbances caused by the Contractor. Greenlight shall be the sole determinant as to the reasonableness of surface disturbances caused by the Contractor