A. Install materials in accordance with drawings, approved Shop Drawings and manufacturer's recommendations. B. Protect electric motors from construction dust and other contaminants. A. Install ATCS as shown on drawings, and in accordance with manufacturer's installation instructions. B. Provide concrete housekeeping pads under pump skid and ball collectors. C. Rigging and setting/installation of ATCS components including coordination of exact delivery date with Manufacturer. D. Provide interconnecting piping between the ATCS components and condenser water piping system as required. E. Provide control devices, raceway systems and/or wiring between the ATCS and the Owners control system. F. Provide electrical service to the ATCS. G. Contractor shall schedule and expedite the manufacturers start-up process and support the Owners commissioning activities. Contractor shall coordinate exact timing of these activities and arrange for appropriate manufacturer personnel to be on-site. H. After successful completion of equipment installation, the Contractor shall assemble and incorporate equipment shop drawings, operating/maintenance instructions, and part lists into the Contractor's project operation/maintenance manuals.