The Contractor shall abide by the details and shall refer to the associated pictures in addition to the scope of work specified within the documents provided below. Roofing • Remove and dispose of all shingle roofing to the deck, install synthetic underlayment, ice and water in valleys, new ridge vents, flashing, white aluminum drip edge, new pipe boots, and other accessories as necessary. • Include ten (10) pieces of sheathing to match existing thickness, installed, in the proposal which is anticipated to be replaced. Adding or sister studs shall be included, as required. • Install architectural grade asphalt shingles, starters, and ridge cap rated for 130 MPH wind resistance or greater. Shingles shall be fastened with a minimum of six (6) hot dipped galvanized nails per shingle. • The Contractor shall include shingle specification and color submittals with their proposal. Siding • Carefully remove and dispose of the gable siding and associated trim. • Include four (4) pieces of sheathing to match existing thickness, installed, in the proposal which is anticipated to be replaced. Adding or sister studs shall be included, as required. • New house wrap, appropriate insulation, flashing, new straight edge fiber cement shingle siding (to match existing characteristics), and PVC trim shall be installed on all three sides of the gable. • Reuse the existing front circular vent, lighting fixture, and signage, if permissible. If these items are not able to be saved and reused, the Contractor shall furnish and replace to closely match. • The new siding shall be painted to match the buildings existing gray color using appropriate exterior paint. Alternate Bid No. 1 – The Contractor shall provide an addition cost to furnish and install one piece of roof sheathing. In the event more than ten (10) pieces are needed, the Contractor shall provide picture documentation to the County POC and refer to this Alternate. Alternate Bid No. 2 - The Contractor shall provide an addition cost to furnish and install one piece of siding sheathing. In the event more than four (4) pieces are needed, the Contractor shall provide picture documentation to the County POC and refer to this Alternate.