MOBILIZATION A. Work included: As described in NCDOT QMS, and Supplementary Specifications and other work incidental to this Item. This line item shall include furnishing of adequate temporary restroom facilities for contractors and their subcontractors to use on site. Not to exceed 5% of total bid. B. Payment: Lump Sum price. C. Single mobilization is preferred for all work specified in this form. D. Contractor must provide the Town a minimum of 72 business hours’ notice prior to work being performed on any roadway. GREENWAY FENCE A. Work included: Installation of the fence as noted on the plans and of the type and style specified below and in the plan set. This work also includes the installation of the Post Anchor Assembly for Culvert and the HILTI MT-BASE Connectors as noted in the culvert plans. All work to be in accordance with the Manufacturer’s specifications. MFG: AMERISTAR 1555 N. MINGO TULSA, OK. 74116 www.ameristarfence.com PHONE: 1-888-333-3422 TYPE: AEGIS PLUS STYLE: GENESIS WITH BALLCAP POST TOP 48”, 3-RAIL X 8’ NOMINAL PANEL COLOR: BLACK OR EQUIVELENT B. Payment: Linear Foot. No separate payment will be made for the connections to the culvert. GUARDRAIL END UNITS, TYPE - TL-2 A. Description Furnish and install guardrail end units in accordance with the details in the plans, the applicable requirements of Section 862 of the Standard Specifications, and at locations shown in the plans. B. Materials Furnish guardrail end units listed on the NCDOT APL. Units shall not be modified by the manufacturer and installer once approved and on the NCDOT APL.