1. MOBILIZATION 1 LS 2. COMMON EXCAVATION (including disposal of excess material at site provided by CONTRACTOR, to include but not be limited to, approximately 8,200 LF of swales) 1 LS 3. UNDERCUT EXC AVAT ION and BORROW backfill and compaction (including disposal of excess material at site provided by CONTRACTOR) 200 CY 4. CLEARING AND GRUBBING 1 LS 5. B R E AK & REMOVE E X I S T I N G PAVEMENTS, (including disposal at site provided by CONTRACTOR) a. Asphalt Pavements (approximately 14,900 SY) b. Concrete Parking (approximately 810 SY) 1 LS 1 LS c. Concrete Drives (approximately 1,260 SY) 1 LS d. Concrete Roads (approximately 1,600 SY) 1 LS e. Concrete Sidewalks (approximately 1,150 SY) 1 LS f. C o n c r e t e Curb s and G u t t e r s (approximately 350 SY) 1 LS g. Brick Walks (approximately 12 SY) 1 LS h. Gravel Drives/Parking (approximately 950 SY) 1 LS