The specific scope of work for the selected CM@R for the Project will be defined in the construction management agreement. However, at a minimum, the following services are required of the CM@R: Provide preconstruction phase services, including cost estimating, life-cycle cost analysis, value engineering, BIM-driven conflict resolution, constructability reviews, scheduling, phasing plans, etc. • Provide and maintain Request For Information (“RFI”) and submittal logs for the project accessible by owner / architect / contractor. • Assistance with preparation of Preferred Alternate’s evaluations with the design team, McMillan Pazdan Smith (“MPS”) and /or for potential presentation to Hickory City Council. • Develop and maintain a master project schedule with special attention given to materials with long lead times in terms of procurement, shop drawings, submittals • Prepare and maintain a cash flow analysis • Define and prepare scopes of work for bid packages • Develop site management and safety plan • Provide construction management and general contracting services • Develop a phasing and sequencing plan • Establish and maintain quality control standards • Provide Guaranteed Maximum Price(s) (“GMP(s)”) • Project Construction Cost for the 1st Phase is estimated at $5 million