This project will combine multiple repairs and capital improvements to an existing Field Maintenance Shop (FMS). FMS 13 consists of an approximately 9,200 SF shop area, a 2,000 SF covered wash rack, and a 900 SF storage building. Planned improvements will include: • Update shop lighting to appropriate LEDs, add light switches at main entrance door • Add electrical outlets along the middle wall of the maintenance bay and along shop desk wall • Remove unused old conduit, piping and outlets • Investigate and properly label the circuits in existing electrical panels • Investigate, repair and/or replace the shop floor heating systems • Install low speed high volume fans for air movement on the shop floor • Replace the shop office area heating unit and window AC units with new system • Replace hose bibs in and outside of the shop • Renovate the bathroom by repairing/replacing broken bathroom fixtures, heating, lights, hose bibs, windows, doors, and adding drop ceilings. • Remove the old roll up doors from the interior of the FMS