Move current control room and studio equipment to the new Broadcast Studio located in the Jack Hunt Campus Center. Test current equipment in its current location to verify working order, then uninstall and move to new location. Install the equipment in its new location, replacing an existing rack with a new rack that will house the Leightronix broadcast server and peripherals. The College will be responsible for providing connections form their cable service provider. Provide and install a new Tricaster TC1Pro switcher with Flex control panel and provide one day of onsite training. Include 3 years of Prime support from Virzt. The new switcher will incorporate a Netgear AV switch as part of a private production network. The network will provide access to NDI sources and allow wireless control of the switcher. Install, configure, and test a wireless IFB communication system.