Renovation and Repair of remaining structure from the old Boone Trail School destroyed by fire in 2019. Remaining structure will be renovated into park entryway monument. The below construction tasks incorporate a majority of the tasks but may not include all tasks included in the Construction Drawings. • Demo existing metal handrail. • Remove existing limestone ledge cap for refinishing and reset in original location on masonry walls. • Demo existing concrete landing and bearing walls. • Remove portion of existing masonry at end of wall in preparation for new end wall masonry. • Salvage existing brick as needed. • Demo existing (non-energized) light fixture and any wiring, electrical boxes, conduit, etc. • Remove existing charred finishes, clean and prep surface for new masonry anchors. • Prep top of wall for new concrete parapet cap. • Remove exterior layer of brick and temporarily shore opening for installation of salvaged concrete signage. • Install new 1 1/2” diameter steel pipe handrail. • Patch, Repair, and Resurface existing Concrete Stairs, as needed. • Rake back mortar and apply sealant joint. • Infill Existing Masonry openings with brick. • Install New HSS 6” x 6”x 1/4” Steel column and structural HSS Tube Steel Beam. • Install new 8” Reinforced CMU Wall with connection to existing masonry.