A. Site Assessment and Damage Evaluation Conduct field inspections to assess flood-related damage to: o Electrical control panel and all integrated components (breakers, gauges, sensors, switches) o Diesel generator (100 KVA) o Pumps, switches, and any underground or submerged mechanical/electrical systems (pending manufacturer input) o Chain-link perimeter fencing and gates Evaluate potential long-term impacts of submersion on electrical and mechanical systems. B. Technical Design Services Develop design plans and technical specifications for the removal and replacement of: o One (1) Electric Control Panel with integrated components o One (1) Backup Diesel Generator, 100 KVA capacity o 144 Linear Feet of 6-foot-high chain-link fencing with 3-strand barbed wire o Two (2) 8-foot-wide chain-link gates, 6 feet high with barbed wire Design shall comply with applicable codes, standards, and best practices, including: o North Carolina Building Code o NFPA, NEC (electrical) o NCDEQ and FEMA resiliency guidelines (as applicable) C. Permitting and Regulatory Compliance Identify and assist in securing all necessary permits related to construction, electrical, and environmental compliance. Provide technical assistance and documentation for any FEMA or state recovery documentation.