The following is a preliminary scope of work that may be modified during contract negotiations with the selected Design-Builder Team. Site Inventory and Evaluation of Owner’s Criteria Confirmation 1. Site investigations, including survey, subsurface utility investigations, geotechnical investigations, environmental engineering, to verify existing conditions if necessary. 2. Preliminary evaluation of proposed site use, material selection, building systems and equipment and provide recommendations on constructability, time, labor and scheduling factors related to Project cost. 3. Prepare written report summarizing Owner’s Criteria. Schematic/ Preliminary Design (SD) 1. Prepare site, architectural, structural, mechanical, plumbing, fire protection and electrical schematic design plans for County Staff consideration. 2. SD Phase Plans and Preliminary Design report will minimally include: a. Site Development and Design criteria including: site access, easements, circulation and vehicular access, setback requirements, general landscape concept, tree protection measures, lighting areas, utility routing and connections and storm water measure locations. b. Building Design information including: reconfirming design intent, preliminary selection of building systems and materials, utility load review, code compliance, security plan expectations, building system integration with storm water plans and outline specification to integrate systems, products and procedures for architectural, civil and landscape. 3. Work in digital format: AutoCAD or Building Information Modeling (BIM) software...