1. Analysis and Review a. Analyze and review all design, studies, and other relevant documentation completed to date. b. Design work should include all campus conceptual designs prepared to date along with completed renovations to encourage cohesiveness of the campus. c. Studies to include - existing site data, geotechnical surveys, adopted master plans, community surveys, bond feedback, etc., along with any historical documentation relevant to understanding the site, ClearWater, and the community. d. Identify additional studies or investigations that may be required to further document existing conditions. 2. Schematic Design a. Develop Schematic Design inclusive of preliminary engineering for civil, structural, mechanical, and electrical systems.Care is to be given to preserve existing murals on site. b. Prepare a Park and Recreation and Community Development staff approved site plan which will be reviewed by the City’s Design Review Committee, including: i. Approximate footprint of the building and general interior design features. ii. The location of required parking and other site features. iii. Thought towards construction within an active campus. c. Develop a preliminary cost estimate based on the schematic design. d. Provide value engineering as required. 3. Design Development a. Prepare design development, construction drawings, and contract documents based on the project and approved schematic design including site preparation needed. Special attention to be given to existing murals, public engagement of the activity, public safety, and limitations of interruptions for activities on campus and /or access to existing buildings. b. Prepare an interior design plan for the facility, including: i. Location and specifications of all interior furnishings, whether freestanding or built in place. ii. Estimates will include, but not be limited to, design and specifications of flooring, fixtures, security needs, lighting, cabinetry, doors, and trim work.