The Mission and Installation Contracting Command Center -Fort Bragg, NC has a requirement from the 8ᵗʰ POG (A), for a non-personal services contract to procure and install upgrades and replacement components to the access control system (ACS) and intrusion detection system (IDS). The objective of this project is to ensure the proper physical protections are in place to ensure that the Sensitive Compartmented Information Facility is accessible only by those persons with an appropriate clearance, access approval, and clearly identified need-to-know, and maintain DIA accreditation in order operate SOCOM's SOCRATES network.
Please see below, thank you:
1. Are Scaled Drawings available, if so please post. NO, OUTDATED
2. Are Ceilings Suspended? Or Hard Lid? SUSPENDED.
3. Are there existing Cable Trays for wiring above ceilings? NO
4 .Can Existing Wiring be utilized? NO
5. Is a “UPS” required? If so, What Time/Power Duration is required? IN THE QUOTE
6. Are “Or Equal” Equipment substitutions allowed? NO
7. Is “Plenum Wire” acceptable? NO
8. Is “After Hours Access” for said work, available to contractor at no add’l cost to the
Gov’t? NO
9. What is the height of Exterior Cameras? (If any) 8-10’