0001 0000100000-N 800 MOBILIZATION Lump Sum L.S. 0002 9.74 SMI 1245000000-E SP SHOULDER RECONSTRUCTION 0003 487 TON 1260000000-E SP AGGREGATE SHOULDER BORROW 0004 870 SY 1330000000-E 607 INCIDENTAL MILLING 0005 5,433 TON 1491000000-E 610 ASPHALT CONC BASE COURSE, TYPE B25.0C 0006 5,408 TON 1523000000-E 610 ASPHALT CONC SURFACE COURSE, TYPE S9.5C 0007 3,542 TON 1524000000-E SP ASPHALT CONC SURFACE COURSE, TYPE S9.5C (LEVELING COURSE) 0008 787 TON 1575000000-E 620 ASPHALT BINDER FOR PLANT MIX 0009 300 TON 1704000000-E SP PATCHING EXISTING PAVEMENT 0010 435 SF 4413000000-E SP WORK ZONE ADVANCE/GENERAL WARNING SIGNING 0011 4457000000-N SP TEMPORARY TRAFFIC CONTROL Lump Sum L.S. 0012 103,000 LF 4685000000-E 1205 THERMOPLASTIC PAVEMENT MARKING LINES (4", 90 MILS) 0013 250 LF 4687000000-E 1205 THERMOPLASTIC PAVEMENT MARKING LINES (4", 240 MILS) 0014 50 LF 4709000000-E 1205 THERMOPLASTIC PAVEMENT MARKING LINES (24", 90 MILS) 0015 15 EA 4720000000-E 1205 THERMOPLASTIC PAVEMENT MARKING CHARACTER (90 MILS) 0016 22 LF 4850000000-E 1205 REMOVAL OF PAVEMENT MARKING LINES (4") 0017 36 LF 4870000000-E 1205 REMOVAL OF PAVEMENT MARKING LINES (24")