1) GENERAL REQUIREMENTS a) Work shall be performed following all applicable state and local codes and regulations governing this project. b) The Contractor shall be responsible for securing and paying for all permits required to complete the project. c) ONWASA shall provide access to an on-site potable water source (hydrant) for use during the work. d) Access to the plant is restricted, so work schedules and material deliveries must be coordinated in advance with the plant operator to ensure adequate access and avoid/minimize impacts to water production activities. e) This site is also occupied by contractor/s for the construction of the Hwy 24 Force Main Project. All Contractors shall coordinate with each other and with ONWASA staff to eliminate any potential conflicts or hazardous situations. f) The Contractor shall conduct operations in such a manner as to avoid damage to other site facilities (controls, building, security gate, and fencing, etc.) Any such damage shall be repaired by the Contractor at no additional cost to ONWASA.