The scope of work for the project includes the construction of drainage improvements, including pipe, catch basins and manholes, on High Avenue and continuing south onto N Franklin Street. Concrete curb and concrete driveway aprons will be removed and replaced, and the road will be milled and paved. The limits will be marked in the field.
The approximate scope of work for the major items for the Base Bid for this project includes 1230 LF 24-inch HDPE, 48 LF 19 x 30 elliptical pipe, 60 LF 15 inch HDPE, 6 catch basins, 1 manholes, 1050 LF concrete curb, 168 SY concrete driveway apron, 4245 SY milling, variable depth, leveling, 500 TONS paving, 2 inch thick top course, and pavements markings and striping and other associated work as needed for a complete, in place project. Traffic control will be performed by Village staff.
The scope of work for the project includes the construction of drainage improvements, including pipe, catch basins and manholes, on High Avenue and continuing south onto N Franklin Street. Concrete curb and concrete driveway aprons will be removed and replaced, and the road will be milled and paved. The limits will be marked in the field.
The approximate scope of work for the major items for the Base Bid for this project includes 1230 LF 24-inch HDPE, 48 LF 19 x 30 elliptical pipe, 60 LF 15 inch HDPE, 6 catch basins, 1 manholes, 1050 LF concrete curb, 168 SY concrete driveway apron, 4245 SY milling, variable depth, leveling, 500 TONS paving, 2 inch thick top course, and pavements markings and striping and other associated work as needed for a complete, in place project. Traffic control will be performed by Village staff.
The scope of work for the project includes the construction of drainage improvements, including pipe, catch basins and manholes, on High Avenue and continuing south onto N Franklin Street. Concrete curb and concrete driveway aprons will be removed and replaced, and the road will be milled and paved. The limits will be marked in the field.
The approximate scope of work for the major items for the Base Bid for this project includes 1230 LF 24-inch HDPE, 48 LF 19 x 30 elliptical pipe, 60 LF 15 inch HDPE, 6 catch basins, 1 manholes, 1050 LF concrete curb, 168 SY concrete driveway apron, 4245 SY milling, variable depth, leveling, 500 TONS paving, 2 inch thick top course, and pavements markings and striping and other associated work as needed for a complete, in place project. Traffic control will be performed by Village staff.