Specifications include, but are not limited to: 1.Evaluate existing conditions of Whitney Stream, including but not limited to, topography, stream bank stability, existing vegetative communities and trees. 2.Perform surveying and mapping services as necessary for design and permitting. 3.Prepare and file all necessary regulatory agency permits. Consultant shall identify permits in proposal. All tasks associated with permitting process preparation of sediment sample plan, etc., shall be included with this task. Preparation of the Environmental Assessment Form as required by SEQRA is not part of this task. Any maintenance permits required to implement recommended maintenance management plan shall also be included with this task. 4.Obtain sediment samples for testing and analysis as may be required for permitting and disposal. 5.Prepare preliminary plans for Town to review. 6.Provide a schedule for the work and permitting process and construction cost estimates to implement remedies. 7.Attend up to four (4) meetings with DPW and Town representatives to discuss project design elements/requirements. 8.Prepare final design bid documents including construction plans and specifications (construction drawings and specifications must follow Town of North Hempstead boiler plate format).