Specifications include, but are not limited to: 1. Mobilization 2. Erosion and Sediment Control, Site Preparation and Staging 3. Installation of Temporary Controls 4. Maintenance and Protection of Traffic 5. Shoring and Bracing 6. Dewatering 7. Pest Control 8. Snow Removal 9. Selective and Structure Demolition 10. Excavation and disposal of contaminated soils 11. Pile foundations 12. Foamed glass aggregate and cover/cap materials 13. Utility infrastructure, terminations and new service stubs including site lighting and photovoltaic system. 14. Administrative and Retail buildings 15. Spray Ground and water feature infrastructure 16. Concrete walkways 17. Soil, Sod and Plantings 18. Site Furnishings 19. Playground surfacing and equipment 20. Final project cleaning and disposal 21. Demobilization 22. Closeout Engineer's