Specifications include, but are not limited to: A. REMOVE OLD T-BAR EQUIPMENT AND HAUL TO A STORAGE SITE NO MORE THAN 10 MILES FROM THE EXISTING SITE (BUILDINGS AND OLD FOOTERS TO REMAIN) B. REMOVAL OF TOP SOIL 7’ WIDE, FULL LENGTH OF LIFT AND REPLACE WITH 1 1/2” CLEAN STONE C. TOP SOIL TO BE HAULED TO A SITE WITHIN 1,800’ OF JOB SITE D. PROURED IN PLACE FLOOR AND WALLS TO SUPPORT DRIVE TERMINAL TO INCLUDE ACCESS HATCH, ACCESS LADDER, FLOOR DRAIN WITH DRAIN PIPE TO RUN TO DAY LIGHT AND HEATERS TO MELT SNOW IN VAULT. E. INSTALL 6” X6” X 6’ PRESSURE TREATED TIMBERS, SECURED TO GROUND WITH 18” X 5/8” REBAR AS SUPPORT FOR THE EQUIPMENT F. COMMUNICATION WIRE RUN FROM TOP TO BOTTOM INCLUDING OUTDOOR PHONES ATTACHED. G. 0000 ALUMINUM DIRECT BURIAL 4 CONDUCTOR WIRE PLACED IN 1,000’ TRENCH AND BACKFILLED. H. PROVIDE COMPLETE INSTALLATION OF 840’ MAGIC CARPET LIFT INCLUDING HAND RAILS I. PROVIDE LABOR AND MATERIALS REQUIRED FOR EROSION CONTROL AND REVEGETATION OF DISTURBED AREAS J. PROVIDE (2), 200 AMP. 480 VOLD RATED FUSED DISCONNECTS K. INSTALL FABRIC EVENT FENCING FULL LENGTH, BOTH SIDES OF LIFT. INCLUDES LABOR AND MATERIALS.