Specifications include, but are not limited to: a. NDT (UT) of raw material and liquid penetrant inspection after machining. These inspections will be designated hold point for NYPA representative to inspect. Inspection must be performed by a technician certified to ASNT – TC- 1A level 2. b. All hardness and surface finishes shown on the drawing shall be adhered to. Surface finish to be 125rms. Nicks and burrs, etc. will not be acceptable. Edges and corners must be chamfered as shown on the attached drawing. All sharp edges shall be removed. The bearing journal areas shall be finished to 63rms. c. Tolerances to be as follows: i. Axial centerline of shaft shall be perpendicular to both end faces of the shaft to within .001” ii. Parallelism of end faces shall be within .003”