Specifications include, but are not limited to: Installation of the hydrogen peroxide storage tank and associated tank restraint system on the existing concrete containment dike; installation of a tank level monitoring and alarm system; installation of the hydrogen peroxide fill port within the existing concrete curbing inside the Quonset hut; installation of electronic metering pumps for the hydrogen peroxide; installation of hydrogen sulfide tank monitoring and control systems; and, installation of all associated piping and supports. The Contractor will be also responsible for installation of all electrical, including the required 120 V power supply, connections, conduit and signal wire. The Contractor shall furnish and install all probes, sensors, panels, etc. as outlined on the Contract Drawings and the Technical Specifications. The Contractor shall also furnish and install the preengineered access stairs for the existing concrete containment dike for the tank.