CLEARING AND GRUBBING LS 1 203.02 UNCLASSIFIED EXCAVATION AND DISPOSAL CY 586; 203.03 EMBANKMENT IN PLACE CY 1; 206.05 TEST PIT EXCAVATION EACH 5; 209.22 STABILIZED CONSTRUCTION ENTRANCE SY 200; 304.12 SUBBASE COURSE, TYPE 2 CY 399; 404.0001 PLANT PRODUCTION QUALITY ADJUSTMENT TO ASPHALT ITEMS QU 1,357; 404.0002 PAVEMENT DENSITY QUALITY ADJUSTMENTS TO ASPHALT ITEMS QU 1; 404.0589 SHIM COURSE F9, ASPHALT TON 253; 404.0962 9.5 F2 TOP COURSE ASPHALT, 60 SERIES COMPACTION TON 17,230; 406.0962 9.5 F2 TOP COURSE ASPHALT WITH FIBERS, 60 SERIES COMPACTION TON 9,615; 407.0102 DILUTED TACK COAT GAL 19,521; 418.7603 ASPHALT PAVEMENT JOINT ADHESIVE LF 88,420; 490.10 PRODUCTION COLD MILLING OF BITUMINOUS CONCRETE SY 209,964; 490.30 MISCELLANEOUS COLD MILLING OF BITUMINOUS CONCRETE SY 6,740; 503.1013 PCC FOUNDATION FOR PAVEMENT, PEM CONCRETE CY 67