Specifications include, but are not limited to: 1. Contractor shall furnish access and all necessary equipment, tools, scaffoldings and experienced crew required for examination of and all repairs to the brick masonry, stone panels, concrete spandrels, parapet walls, windows, steel, copings and all other facade and superstructure building components. 2. Using personnel experienced in brick masonry and steel repairs the contractor, jointly with the Architect/Engineer, shall examine the existing conditions of all facade components at close range. They shall mark all spalling, cracks, misalignments, rust stains, and any other signs of deterioration. Any and all unsafe and/or critical conditions that require immediate attention shall be recorded for immediate action. Contractor shall not proceed without written authorization from A/E. Contractor should notify A/E of additional conditions not noted on SOW documents. 3. Avoid using tools that may damage the existing facade and facade component finished surface. 4. All existing waterproofing/flashing at the superstructures and facades shall be inspected and any material failure, rust stains, spalling, etc. shall be reported to the Architect.