Specifications include, but are not limited to: A. Geography 1. 5-30 miles from 55 Water Street, New York, NY. Excluding Manhattan 2. Walking distance from public transportation 3. 5 or more suitable locations for TRS B. Timeframe 1. Services must be provided within 24-48 hours of declaration (Measured in line with the agreed Service Level Agreement (SLA) 2. Response must include the pricing for 30 days of recovery, 60 days of recovery, 90 days of recovery, and 120 days of recovery. C. The Vendor must have the ability to update workstation images provide by TRS that will be used by TRS. Connectivity requirements: 1. Minimum 10mb/s connection per person, with minimum 1GB dedicated wired connection for all 100 users in a single location with redundancy 24/7.