The Project generally consists of the following: Contract 2A: • Headworks – New Influent Pumps, Mechanical Fine Screen, Washer/Compactor, and Aerated Grit System Equipment consisting of Aeration Diffusers, Grit Blowers, Grit Screw Conveyor, Grit Bucket Elevator, and Grit Classifier. • Secondary Clarification – New Secondary Clarifier Sludge Collection Mechanisms. • Solids Handling– New RAS/WAS Pumps, New Digester Tank Aeration Equipment including dedicated Aeration Blowers and Diffusers, Installation of Owner-Purchased Belt Filter Press and Belt Filter Press Feed Pump. • General Facility – Supporting process piping and building Architectural and Civil/Site improvements. Contract 2B: • Improvements include the demo and installation of new HVAC equipment for the Headworks/Administration Building and Dewatering Building. Contract 2C: • Includes removing power to existing process equipment that is to be demolished and connecting all new process equipment including new influent pumps, mechanical fine screen, washer/compactor, aerated grit system, secondary clarifier, RAS/WAS pumps, and aeration blowers for aerobic digesters. • Includes furnishing and installing all control wiring for new process equipment associated with Contract 2A. • Includes demolishing existing power and connecting all new equipment associated with Contract 2B