Specifications include, but are not limited to: a) Contractor shall provide the services for each snow/ice storm event unless otherwise directed by the Facility Manager. The Contractor shall provide services/ surface treatments once any snow has fallen and as often as necessary to mitigate snow and/or ice accumulations. It is expected that snow accumulations shall not exceed two (2) inches at any time during a snow event. No amount of ice accumulation is acceptable. Contractor shall take preventative measures to avoid ice build-up and shall take appropriate action to remove ice should it build-up on any vehicular and pedestrian surfaces mentioned herein. b) Snow piles/banks shall not be placed in such a manner as to block the view from a standard vehicle or block any parking space(s). Snow accumulation areas shall be coordinated with the Facility Manager. Contractor is expected to clean the area from curb to curb each storm within 24 hours from the completion of the storm. c) Snow will be pushed as far away from designated parking lanes and areas as possible. d) After the plowing/removal of snow and/or ice, rock salt or a sand and salt mix shall be effectively applied to all parking areas, parking lots, sidewalks, shelters, building entrances and driveways with the intent to prevent the build-up of ice and thereby reduce the risk of pedestrian slipping and falls. Due to parking needs ALL spaces will be opened after each snowfall.