Scope of Work: Snow shall be removed from three (3) parking lots when accumulation is equal to or greater than 2", or when blowing and/or drifting snow exceeds 2". A coating shall be removed by the time specified in this contract Snow must be removed and salt applied (as needed) no later than the times indicated below on days in which the offices are open and continue during office hours unless otherwise advised by the Highway Superintendent. Upper Town Hall Parking Lot: 7:30 a.m. Lower Town Hall Parking Lott: 7:30 a.m. Post Office Parking Lot: 7:30 a.m. On days offices are not open (weekends, holidays, closings) the upper parking lot shall be cleared at least 1 hour in advance of scheduled Board meetings or when court is held. Post Office needs to be plowed as per open schedule. Specific schedules/arrangements shall be confirmed with the Highway Superintendent. a. Contractor shall apply a salt mix after each plowing (as needed); in addition, contractor will apply salt during icing conditions following the same schedule detailed above (for snow removal), and as requested by the Highway Superintendent. A salt mix will be supplied by the municipality. Contractor will need to load their spreader by hand. b. The contractor shall not pile snow in such a way that access to walkways and/or driveways is restricted.