Hull/Deck General Inspect exterior hull and deck for weld defects. Replace performance wings (2) with full-length reinforced 3rd Gen (2019 Build) version Replace all thru hull fittings, seacocks / valves, clamps and hoses. Replace raw water intake filter with Groco ARG-750S Replace aft motor guard / tow line guide, including mounts on outboard bracket. Replace all Anodes on hull with new Aluminum Anodes. Remove underwater lights & patch holes (2) in aft engine bracket. Install 6 tie-down anchors points on starboard side of interior pump room storage area as directed. Install rack to secure 5-gal foam containers (4) on port side of engine compartment. Dimensions to be provided by customer. Nonskid: Remove all remaining nonskid from vessel including deck, cabin floor and roof, aft engine bracket, around bow monitor and on fire pump room enclosure and steps. Soda-blast areas where non-skid has been removed utilizing existing non-skid pattern. Replace grip tape on all grab rails with sodablast.