The following is a general description of the work to be done under this Contract. This list is intended to give the Contractor a general description of the work involved in this Contract and is not a complete listing of all work to be done. All work shall be done in accordance with the Contract Documents even though not specifically mentioned in this list. 1. Set up Work Zone Traffic Control items. 2. Install Class A Containment enclosures. 3. Clean existing structural bridge steel. 4. Paint four coat system on cleaned structural bridge steel. 5. Remove Class A Containment enclosures. 6. Clean up site(s) and remove Work Zone Traffic Control items. The following locations shall receive full paint removal and four coat paint system on all girders, diaphragms, web stiffeners, connection plates, and bearings. The finish coat color shall be brown. The color shall conform to Federal Color Standard No. 595. • MP 289.63 - BIN 5510240 – VanBuren Road over I-90 • MP 319.19 - BIN 5510430 – Black Brook Road over I-90 • MP 324.16 - BIN 5510480 – Nine Foot Road over I-90