The project scope of work generally includes, but is not limited to asbestos abatement, selective demolition, concrete, masonry, metals, interior finishes, openings, roofing, finishes, specialties, furnishings, roofing, fire suppression, plumbing, mechanical, electrical, communication, fire alarm, sitework, and exterior improvements. Project shall include, selective demolition, asbestos-containing material removal and hazardous waste removal, including removal of ceiling plaster and of built-in wardrobes as ACM. Installation of buildingwide fire protection system, construction of soffits and new finishes as required by removals. In addition, the demolition and reconfiguration of the existing bathrooms of Capen Hall shall include new partitions, doors and hardware, finishes, fixtures, and toilet accessories. The scope of work also includes the reconfiguration of the sprinkler system into the bathrooms and replacement of the existing exhaust system with roof mounted Energy Recovery Ventilator system including supply and return ductwork. The demolition and reconstruction of existing bathrooms shall include finishes and fixtures, domestic risers and distribution and sanitary risers, lighting, power, and fire alarm systems. Upgrades to existing hydronic piping, valves, and pumps are also included. In addition, the scope of work includes the renovation of offices, conference room, and resident director apartment and office.