Specifications include, but are not limited to: 10.7.1 Streets with malls: Malled streets shall be plowed so that the snow is directed to the mall. All turnarounds shall be plowed. 10.7.2 One-way streets: One-way streets shall be plowed to each curb or boundary. That is, the operator shall plow the left side of the center line of the street to the left side and plow the right side of the center line to the right side; and at no time shall the contractor's operator plow a one-way street opposing traffic. Snow shall not be plowed against legally parked cars. 10.7.3 Plowing dead-end streets and alleys: The contractor's operator shall not push snow into the end of a dead-end street or alley. Near the end of a dead-end street or alley, he/she shall pick up the plow blade, proceed to the end of the street or alley, drop the blade and pull the snow back from the end of the street or alley far enough so that he/she can turn around and push the snow out from the end of the street or alley. 10.7.4 Blocked streets: If a street is blocked, the contractor's operator shall make every attempt to bypass the blockage. If unable to bypass the blockage, the contractor's operator shall immediately inform the Snow Office and/or the inspector of the blockage. If the blockage is removed within a reasonable time, the contractor's operator will then plow the street.