Specifications include, but are not limited to:The Authority wishes to pre-qualify prospective firms to submit bids for Contract PAT- 024.031 “PATH - Replacement of Substation No. 7.” This work will be performed at PATH facilities located in New Jersey. It is anticipated but it is not guaranteed that work required by the Contract may include, but may not necessarily be limited to, the following: A. Scope of work 1. Replacement and upgrade of existing Substation No. 7 located in Jersey City, NJ: a. Construction of new two-story steel framed building for the new substation. b. Furnish, install and commission, three (3) new 2,000 KW heavy-duty traction power transformer/rectifier units and 750V DC switchgear. c. Furnish and install Supervisory Control and Data Acquisition (SCADA) system, Synchronous Optical Network (SONET) equipment, and security/access control. d. Furnish, install and commission auxiliary power system consisting of two (2) 2000KVA, 26.4KV/480V transformers, 480V switchboard with main-tie-main configuration and automatic power transfer scheme to provide power for a low tension AC network to feed lighting, HVAC and ventilation equipment. e. Furnish, install and commission HVAC, plumbing/fire protection, fire alarm and lighting systems. f. Furnish and install sub-surface utilities such as electric service, water, sewer and storm water under active city streets and sidewalks. g. Furnish, install and splice new 27KV power feed cables from PSE&G manhole to the new substation. h. Coordinate with local, city and state agencies with respect to acquiring all necessary approvals and permits. i. De-energize, de-commission and demolish the existing Substation No. 7 building and outdoor switch yard after new substation is commissioned into service. j. All installation work to be done without any interruption to PATH train service and facility operations. Prequalify Contractors - Qualification Evaluation Form