Specifications include, but are not limited to: repair of High Lift #1 a Sterling/Peerless Vertical Turbine Pump 450HP 6000 GPM at 220 Ft Head. This repair will be the replacement of the shaft column and bowl assembly and will also include refurbishment of the discharge head to attach to new column/ bowl assembly. DESCRIPTION OF WORK TO BE DONE: All electrical work to be done by City Contractor (All Phase) Order new column and bowl assembly for complete rebuild. Disassemble #1 High Lift Pump Refurbish Discharge Head, ensure it matches with new column and bowl assembly. Reassemble #1 High Lift Pump with refurbished Discharge Head and existing 450hp motor. Coordinate Start up with electrical contractor and City crew. Data Sheets will be attached and labeled #1 High Lift. This package of information will include all relevant information on the original construction in 2000 of the pump